Queenswood bridge inauguration ceremony 1961 Image courtesy of Dr Wendy Bird, Archivist at Queenswood school |
The bridge provided a safe passage for pupils and staff from the school on the south side of the road to the playing fields on the north side.
It was located near the current entrance to the car park. Today only the concrete foundations on the north side of the road survive.
Concrete foundations on the north side of Shepherds Way 2019 Image from the Peter Miller Collection |
The school commissioned Taylor Woodrow (Exports) Ltd to construct the bridge, probably in 1959. On the 13 January 1960 detailed design plans were drawn by Rainham Timber Engineering Co. based in Rainham, Essex.
The 66’9” span bridge was principally constructed from engineered laminated European softwood beams and stanchions, yellow cedar and keruing staircases, and was clad in western red cedar.
Further plans detailing the base plates were drawn on the 23 January 1961. The bridge, which cost £3,000 (about £69,000 at 2019 prices), was completed later that year.
It is likely that the bridge was pre-fabricated off site by Rainham Timber Engineering and the construction was undertaken by Taylor Woodrow. The final timber cladding may have been undertaken by local Welham Green builders Shadbolt & Nash whose workers feature in the photograph below.
Shadbolt and Nash workers posing on the nearly completed footbridge Image from Jack Shadbolt / Bill Killick, part of the Peter Miller Collection |
An inauguration ceremony attended by a large number of parents was held on a Saturday (exact date unknown) in 1961 with the chief constable of Hertfordshire, Colonel A.F. Wilcox, cutting the ribbon across the steps leading up to the bridge. He was introduced by Sir Harold Bellman, the chairman of the school governors, and was thanked by the head girl, Miss P. Greenwood.
Inauguration ceremony close up 1961 Image courtesy of Dr Wendy Bird, Archivist at Queenswood school |
Colonel Wilcox declaring the bridge open Image courtesy of Dr Wendy Bird, Archivist at Queenswood school |
It is not known, at the time of writing , exactly when or why the bridge was dismantled, although it is known from Ordnance Survey maps that the bridge was still extant in 1989/1990.
Barnet Press cutting 1961 Image courtesy Dr Wendy Bird, Archivist at Queenswood school |
Article by Peter Miller - 2019
Comments and information welcome